Homes and villas

Solar for your villa: lower bills, lights on during outages.

Rooftop panels power your home during the day; the hybrid inverter stores the surplus in an LFP battery for use in the evening and overnight. When the grid goes down, the battery takes over automatically. Pool pumps, heat pumps and EV charging connect to the same system.

How many kW do I need?

We divide your annual consumption by your region’s yield. Example: a villa using 1,000 kWh per month in Adana covers its annual needs with a system of about 7.7 kWp (17–18 panels of 450 Wp). If you have a pool, heat pump or EV charging, we add those in.

Battery: for outages and nights

Surplus daytime production charges the battery for use in the evening. During an outage, the inverter switches to the battery; your fridge, lighting, modem, combi boiler and selected outlets keep running. The battery is modular and can be expanded later.

Pool and heat pump

In villas, the biggest loads are often the pool pump and air conditioning. We schedule the pool pump for the hours when the sun is strongest, and power heating and hot water from the sun with a heat pump.

EV charging

A wall-mounted charger fills up your car when there is surplus solar. No license is needed for home charging.

Application and net metering

We handle the connection application with your distribution company (Toroslar EDAŞ in Adana and nearby), project approval and acceptance. For residential customers, net metering is settled monthly.

Monitoring from your phone

Track production, consumption, battery level and grid draw in real time in the app.

During a power outage

Even when the power goes out, the lights stay on.

When the grid goes down, the hybrid inverter switches to the battery. While the neighbors are left in the dark, your lights, fridge and internet keep running.

Frequently asked questions

Is my villa roof suitable for solar panels?

There are mounting structures for tile, terrace and standing-seam roofs. Roofs facing south, east or west with little shade perform well; during the site survey, we measure your roof and draw up a layout.

Will my home keep running during a power outage?

With a hybrid system with a battery, yes: when the grid goes down, the inverter switches to the battery. We decide together during the site survey which appliances will run and for how long.

How long does installation take?

For homes, installation usually takes a few days. The overall timeline depends on the EDAŞ application and acceptance steps.

Free site surveySame-business-day reply WhatsApp Call